/ Views: 51281

Do I need to contact the electrical laboratory when commissioning a residential house?

There are 5 answers
Lilaboyko
Lilaboyko
Answered on December 19, 2017 19:51
Some people neglect the services of the electrolaboratory, and the commissioning of buildings takes place without their participation, but this is fraught with expensive repairs in the future if defects were made in the system.
Best
SashaNuker
SashaNuker
Answered 19 December 2017 21:12
The cost of services of the electrolaboratory is not so high, and it will be much more difficult to eliminate the disadvantages if they emerge already during the operation of the grid or devices.
Best
Anton Smely
Anton Smely
Answered on December 19, 2017 21:22
Electrotechnical Laboratory is engaged in checking the grounding, checks the work of electrical equipment, measures the insulation resistance. In my opinion, all this needs to be checked before putting it into operation at home, otherwise failures may occur in the future, the cost of eliminating which may cost a lot of money.Learn more about why you need these studies here.
[/L_REPEAT]

Related news


Crafts for the Day of Astronautics with their own hands in kindergarten and school of paper, pasta and plastic bottles. How to make your own hands a beautiful crafts in honor of Cosmonautics Day
How to save a family budget
How to do parachuting
How can ammonia be used?
How to make the original card shooter in 5 minutes
Test: Check how good your memory is
How to become fashionable
Ginger meatball soup